Larose to Golden Meadow Hurricane Protection System

D-South "Crawfish Farm" Floodwall will be constructed in phases.  
  • Phase 1 includes making improvements to the existing approximately 596 LF of steel sheet pile wall to achieve a flood protection  elevation of +18 NAVD 88.   Sustantial Completion was held on 12/10/2021.  All Punch List items are compelte
  • Phase 2 addresses the opening created by Phase 1 by raising the entire 160 LF of T-Wall section to elevation +18 NAVD 88.  Notice to Proceed was issued to Sealevel Construction on 01/17/2022.   
D-South Crawfish Farm Floodwall
Aerial view looking north.  Photo taken 12/22/2021, courtesy  of GIS Engineering.
Demoing concrete wall in 2nd phase.