Completed Projects
C-South Levee Improvements
Elevation of levee to +18' from the Cote Blanche Connection to W 107th St.
Engineer: Angelette Design
Contractor: GIS Construction
D-North Levee Improvement
Elevation of levee to +16' near Leonard J. Miller, Jr. Airport. Area was slightly overtopped during Hurricane Ida.
Engineer: Picciola & Associates
Contractor: Outer Limits Contractors
E-North Levee Improvements
Elevation of levee to +16' behind E 44th St. Area was overtopped during Hurricane Ida.
Engineer: Picciola & Associates
Contractor: GIS Construction
Golden Meadow Lock & Pipeline Floodwall Repairs
Repair of scouring around floodwalls in Golden Meadow from Hurricane Ida. Tie-ins were armored with concrete mats after repair.
Engineer: Picciola & Associates
Contractors: Circle, Construction
Larose Floodwall Vessel Impact Barrier
Installation of timber pile clusters along the floodwall on the south bank of the GIWW in Larose to protect the wall from vessel and barge impacts.
Engineer: Angelette Design
Contractors: Low Land Construction